- Projects
- Bespoke pontoon solutions
- Marine engineering
- Mermaid®
- Mooring analysis
- Survey services
- Marine consultancy and project management
- Services
- Integrated marine services
- Wind turbine blade IRM
- Offshore Wind Management System®
- Ship-to-Turbine™
- Offshore personnel
- Vessels and associated services
- Offshore marine equipment
- Temporary power and refuelling solutions
- Multi-skilled personnel
- Rope access services
- Confined space entry teams
- Emergency response teams (ERTs)
- Ancillary diving equipment
- Containerised decompression chambers
- Containerised dive control packages
- Containerised diver hot water system
- Containerised nitrox blender
- Daughter craft air dive systems
- Launch and recovery systems
- Diving equipment design services
- JFMS and its subsidiary Rotos 360 secures framework blade maintenance and repair contract with Vattenfall
- Subsea cable installation providers Prysmian Group takes Mermaid® to reduce weather risk and optimise offshore operations
- JFMS teams up with not-for-profit to promote clean and healthy oceans
- James Fisher nets contract to ensure future O&M performance at East Anglia ONE
- Archive
Bespoke LARS design and manufacture
James Fisher Subsea designed, manufactured and installed a bespoke, temporary twin basket diver deployment system on an FPSO.
The diver Launch and Recovery System (LARS) was designed and built in accordance with IMCA D023, Lloyds ‘Code for Lifting Appliances in a Marine Environment’ and ATEX Zone II compliance due to the location of the installation.
Adapting to limited access, the LARS including the deployment frame was mounted on an existing gantry structure located on the collar deck of the turret, which was designed and manufactured as a modular solution to enable flexibility during installation and removal.
Designed to mitigate against operational downtime, the LARS included two separate dive baskets, each of which included its own clump weights, winches, hydraulic hoses, Hydraulic Power Unit (HPU) and joystick control systems.
In addition, each system had its own internal back-up with each HPU having two sets of components, sharing only the frames, control panel and system integration points - making the system fully redundant enabling efficiency and complete operational reassurance.
The project was completed on-time, within budget and delivered against the customer’s specific requirements with recognition provided to the professionalism demonstrated by M&DS.